ODINAFRICA Project Document
Workplan
In order to ensure the effective implementation of the
project, an appropriate project management structure needs to be
established which will not only ensure that the project is implemented
in-line with the main objectives and within the available budget,
but which will also ensure that national and regional priorities
identified by the Member States are fully taken into consideration
in the workplan.
We
remark that the project document includes MAIN OBJECTIVES and related
activities only. This will result in ACTIVITY ENVELOPES. The way
these envelopes will be used by the individual member states and
regions will be decided by the Member States during Annual Project
Management Workshops, typically organized during the last month
of each operating year.
During
the meetings of the sessional groups on ODINAFRICA during the 20th
Session of the IOC Assembly (June/July 1999) it was recommended
to identify regional coordinators for each region: one for the IOCINCWIO
region, one for the IOCEA region, one for the Mediterranean region
and one for the Southern Africa region. It was also recommended
to appoint a general coordinator. However, taking into consideration
the budgetary implications of supporting these 5 coordinators it
was agreed that 3 coordinators will suffice: one for the IOCEA region
and Mediterranean, one for the IOCINCWIO region including South
Africa, and one general project coordinator. Furthermore it was
proposed that the IOCINCWIO regional coordinator will also take
up the function of general project coordinator. However, a final
decision on this matter will be made during the first Annual Project
Management Workshop (Sub-activity 1.1) in 1999.
Main
Activity Workplan and Timing
Note:
g indicates time period when activity takes place or which financial support
covers
Note:
¨ indicates external expertise is required
for this activity: expertise Partners are listed under
MAIN ACTIVITY 1: Project Management
· Sub-activity
1.1: Annual Project Management Workshop ¨
Rationale: During the annual Project Management Workshop
the Member States and the donors will evaluate the progress of the
project, as well as discuss and agree upon the workplans and budgets
for the activities to be implemented the following year(s). Note that
during the first this event will be organized to discuss and agree
upon the Project Management structure (see 6.1).
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
1.2: Project Staffing and Management costs
Rationale:
This includes the cost of project staff, both at the local (national)
level and at the regional level. The national project staff cost
will be absorbed totally by the cooperating institutions.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
2.1: Organization of national coordination meetings to identify
suitable host institutions for NODC/DNA (including information management)
Rationale:
in
order to fully benefit from the IODE system and the project Member
States will be requested to formally establish NODCs or DNAs (including
information management centre) as per IODE guidelines. Financial
assistance (and expertise, where required) will be provided for
the organization of national coordination meetings to decide on
the most suitable host institution for the NODC/DNA.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
2.2: Formal establishment of NODC/DNA (including information management
centre)
Rationale:
in
order to fully benefit from the IODE system and the project Member
States will be requested to formally establish NODCs or DNAs (including
information management centre) as per IODE guidelines.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
2.3: Provision of Hardware and Software Package
Rationale:
in
order to ensure that the data and information centres can fully
participate in the technical aspects of the project (and in a harmonized
way) a standard hardware and software package will be provided.
This will also facilitate problem solving. Hardware will be provided
for both the data and information centres.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
2.4: Provision of support for operational expenses data and information
centre
Rationale:
support
will be provided for day-to-day operational expenses required to
operate the data and information centres (telecom, Internet access,
office supplies, overtime,…). Emphasis will be placed on development
of products and services leading to self-support of the data and
information centres.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
MAIN
ACTIVITY 3: Providing training opportunities in marine data and
information management applying standard formats and methodologies
as defined by the IODE
·
Sub-activity
3.1: Development of ODINAFRICA/IODE Resource Kit
¨
Rationale:
In
order to ensure standardization of software, formats methodology
as well as training curricula, and to enable students to self-study
subsequent to group training courses, a comprehensive PC-based training
package (CD-ROM) will be developed by a group of IODE experts based
on the IODE Resource Kit. The ODINAFRICA Kit will include substantial
data and information sets relevant to Africa.
The kit will be updated annually.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
3.2: Regional Data Management Training Course
¨
Rationale:
Three
regional data management training courses will be organized covering
all responsibilities and their technical aspects covered by NODC/DNA
as well as data product development.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
3.3: Regional Data Management Training Course Follow-up and Support
¨
Rationale:
In
order to ensure that the trainees can make optimum use of the knowledge
gained during the training courses and to ensure implementation
of 'take home' tasks assigned during the courses a small team of
experts shall be contracted to provide Internet-based follow-up
and support.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
3.4: Regional Information Management Training Course
¨
Rationale:
Three
regional information management training courses will be organized
covering all responsibilities of RECOSCIX cooperating institutions,
as well as library management and library services.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
3.5: Regional Information Management Training Course Follow-up and
Support ¨
Rationale:
In
order to ensure that the trainees can make optimum use of the knowledge
gained during the training courses and to ensure implementation
of 'take home' tasks assigned during the courses a small team of
experts shall be contracted to provide Internet-based follow-up
and support.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
4.1: GODAR Participation: identification, repatriation and digitization
of Africa related datasets from outside (and within) Africa
¨
Rationale:
a
large amount of data relevant to Africa are archived throughout
the world but are not available to African scientists. This sub-activity
will assist in the identification, repatriation and digitization
of these data, within the framework of the GODAR project.
Timing:
| 2000 |
2001 |
2002 |
2003 |
|
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
J F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
4.2: Development of national and regional meta databases
Rationale:
the
MEDI format and MEDI software will be used to develop national and
regional metadata bases covering national data holdings (describing
also the data sets recovered under sub-activity 4.1). One volunteer
data centre will host the regional (African) metadatabase on a WWW
site.
Timing:
| 2000 |
2001 |
2002 |
2003 |
| J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
4.3: Development and maintenance of national and regional data archive
Rationale:
in
order to ensure the easy availability of datasets for the preparation
of data and information products a computerized database system
will be developed at the national (and possibly regional) level.
Timing:
| 2000 |
2001 |
2002 |
2003 |
| J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
5.1: Support for national workshops on data/information service/product
requirements for the sustainable management of coastal resources
and the coastal zone
Rationale:
support
will be provided for workshops at the national level to identify
data and information product requirements based on national ocean
programmes, ICAM plans and other relevant policy documents and policies.
Timing:
| 2000 |
2001 |
2002 |
2003 |
| J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
5.2: Support to the RECOSCIX networks
¨
Rationale:
the
RECOSCIX networks will be provided with support to continue their
'traditional' information services (query handling, document delivery),
as well as to assist in the effective dissemination of information
products to end users.
Timing:
| 2000 |
2001 |
2002 |
2003 |
| J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
5.3: Support for development of data and information products
Rationale:
As
a follow-up to sub-activity 5.1 support will be provided for the
development of specific data and information products.
Timing:
| 2000 |
2001 |
2002 |
2003 |
| J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
|
|
|
|
|
·
Sub-activity
5.4: Support for public awareness creation on the project services
and products
Rationale:
support
for specific activities by the data and information centres to publicize
the products and services provided/developed by the project and
the centres. Emphasis will be placed on development of products
and services leading to self-support of the data and information
centres.
Timing:
| 2000 |
2001 |
2002 |
2003 |
| J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
J
F M A M J J A S O N D |
|
|
|
|
|

|